Projects
At Diamond Beauty Limited, we consistently led and delivered high-impact projects with excellence—surpassing client expectations, earning commendations for quality, and receiving consistent positive feedback for outstanding customer satisfaction.
S/N | PROJECT DESCRIPTION | CLIENT |
1 | CONSTRUCTION, LAYING, AND CIVIL SCOPE OF THE PIPELINE TIE-IN AT CPF, EKET(SEPTA/FRONTIER) | FRONTIER/ SEPTA |
2 | FIRE FIGHTING AND SAFETY EQUIPMENT, LINER HEAT DETECTOR, (FABRICATE& INSTAL).FOR UQUO GAS PLANT | SEVEN ENERGY/PETROFAC |
3 | FIRE FIGHTING AND SAFETY EQUIPMENT | FUN |
4 | FOAM CONCENTRATE PACKAGES | FUN GROUP |
5 | FIRE HEATER PACKAGES | SEPTA/ SINOPEC/ PETROFAC |
6 | BROWN FIELD DECOMMISSIONING GBARAN | SAIPEM |
7 | INTELLIGENCE PIG SURVEY 3 ICP LINES | SAIPEM |
8 | SUPPLY OF PRESSUREGAGES | SAIPEM |
9 | FLUSHING, PIGGING, HYDROTEST, DE-WATERING, DRYING, NITROGEN PURGING AND PACKING OF 4” X 6”KM | EXON MOBIL/GOLDE N METRO |
10 | FLUSHING AND HYDROTEST OF 10”X 6KM EKULAMA DELIVERY LINE | OIS SPDC PROJECT/GOLDEN METRO |
11 | PROVISION OF FLUSHING SPREAD – PERSONNEL AND EQUIPMENT TO MOBIL FIELD – VIKING FORCADOS | EXXON MOBIL |
12 | 14 » X 18 KM INIM –EDOP PIPELINE DEOILING | EXXON MOBIL |
13 | CONSTRUCTION/FABRICATION OF COMMUNICATION TOWER/MAST | AGIP |
14 | MAINTENANCE OF AIR ACTUATED WINCH | MPNU/GM L |
15 | RURAL ELECTRIFICATION PROJECT | AKSG |
16 | CLEANING/ACID PICKLE OF ASABO (MODULE C) GAS PROCESS PIPELINE. | ASABO FIELD- EXXONMOBIL |
17 | CLEANING/ACID PICKLE OF ASABO (MODULE E) GAS PROCESS PIPELINE. (ASABO FIELD- EXXONMOBIL) | EXXONMOBIL- OFFSHORE |
18 | CLEANING/FLUSHING OF RISERS IN THE ONGOING RISER REPAIR PROJECT FOR MOBIL PRODUCING NIGERIA.(EXXONMOBIL- OFFSHORE) | EXXONMOBIL- OFFSHORE |
19 | PIGGING/DECOMMISSIONING OF 20” X27KM EKPE-USARI-IDOHO PIPELINE, AND THE SUPPLY OF ALL THE PIGS/CONSUMABLE MATERIALS; 20″ LOW DENSITY, 20″ MEDIUM DENSITY, 20″ HIGH DENSITY, 20″ GUAGE PLATES. |
|
20 | CLEANING/ACID PICKLE OF ASABO MODULES C & D PROCESS PIPINGS. |
|
21 | CRUDE TRANSFER FROM PRODUCTION TEST SURGE TANK TO AGIP FLOW-STATION NIMBE |
|
22 | SPM-I BOUY CHANGE-OUT FLUSHING/HYDROTEST OPERATION |
|
23 | PIGGING OF 24 X 62KM OB/OB TO RUMUOJI PIPELINE AND THE SUPPLY OF ALL THE PIGS/CONSUMABLES; 24″ FOAM PIG, 24″ CUP PIG, 24″ BIDI WITH BRUSHES, 24″ BIDI WITH GUAGE |
|
24 | EXPLORATORY/MAINTENANCE PIPELINE PIGGING SERVICES |
|
25 | ACID PICKLING & PASSIVATION OF AGIP (KWALE) GAS PLANT |
|
26 | SPM CHANGE OUT BACK FLUSHING |
|
27 | CHEMICAL CLEANING OF IBOM POWER PLANT GAS LINE. |
|
28 | PIGGING OF 1 NO 18” X 14KM AND 2 NOS 4” X 14KM KWALE-IPP GAS LINE. |
|
29 | CONSTRUCTION/FABRICATION OF 4” X 32” GANGWAY |
|
30 | RURAL ELECTRIFICATION PROJECT II |
|