Projects

At Diamond Beauty Limited, we consistently led and delivered high-impact projects with excellence—surpassing client expectations, earning commendations for quality, and receiving consistent positive feedback for outstanding customer satisfaction.

S/N

PROJECT DESCRIPTION

CLIENT

1

CONSTRUCTION, LAYING, AND CIVIL SCOPE OF THE PIPELINE TIE-IN AT CPF, EKET(SEPTA/FRONTIER)

FRONTIER/ SEPTA

2

FIRE FIGHTING AND SAFETY EQUIPMENT, LINER HEAT DETECTOR, (FABRICATE& INSTAL).FOR UQUO GAS PLANT

SEVEN ENERGY/PETROFAC

3

FIRE FIGHTING AND SAFETY EQUIPMENT

FUN

4

FOAM CONCENTRATE PACKAGES

FUN GROUP

5

FIRE HEATER PACKAGES

SEPTA/ SINOPEC/ PETROFAC

6

BROWN FIELD DECOMMISSIONING GBARAN

SAIPEM

7

INTELLIGENCE PIG SURVEY 3 ICP LINES

SAIPEM

8

SUPPLY OF PRESSUREGAGES

SAIPEM

9

FLUSHING, PIGGING, HYDROTEST, DE-WATERING, DRYING, NITROGEN PURGING AND PACKING OF 4” X 6”KM

EXON MOBIL/GOLDE N METRO

10

FLUSHING AND HYDROTEST OF 10”X 6KM EKULAMA DELIVERY LINE

OIS SPDC PROJECT/GOLDEN METRO

11

PROVISION OF FLUSHING SPREAD – PERSONNEL AND EQUIPMENT TO MOBIL FIELD – VIKING FORCADOS

EXXON MOBIL

12

14 » X 18 KM INIM –EDOP PIPELINE DEOILING

EXXON MOBIL

13

CONSTRUCTION/FABRICATION OF COMMUNICATION TOWER/MAST

AGIP

14

MAINTENANCE OF AIR ACTUATED WINCH

MPNU/GM L

15

RURAL ELECTRIFICATION PROJECT

AKSG

16

CLEANING/ACID PICKLE OF ASABO (MODULE C) GAS PROCESS PIPELINE.

 ASABO FIELD- EXXONMOBIL

17

CLEANING/ACID PICKLE OF ASABO (MODULE E) GAS PROCESS PIPELINE. (ASABO FIELD- EXXONMOBIL)

EXXONMOBIL- OFFSHORE

18

CLEANING/FLUSHING OF RISERS IN THE ONGOING RISER REPAIR PROJECT FOR MOBIL PRODUCING NIGERIA.(EXXONMOBIL- OFFSHORE)

EXXONMOBIL- OFFSHORE

19

PIGGING/DECOMMISSIONING OF 20” X27KM EKPE-USARI-IDOHO PIPELINE, AND THE SUPPLY OF ALL THE PIGS/CONSUMABLE MATERIALS; 20″ LOW DENSITY, 20″ MEDIUM DENSITY, 20″ HIGH DENSITY, 20″ GUAGE PLATES.

 

20

CLEANING/ACID PICKLE OF ASABO MODULES C & D PROCESS PIPINGS.

 

21

CRUDE TRANSFER FROM PRODUCTION TEST SURGE TANK TO AGIP FLOW-STATION NIMBE

 

22

SPM-I BOUY CHANGE-OUT FLUSHING/HYDROTEST OPERATION

 

23

PIGGING OF 24 X 62KM OB/OB TO RUMUOJI PIPELINE AND THE SUPPLY OF ALL THE PIGS/CONSUMABLES; 24″ FOAM PIG, 24″ CUP PIG, 24″ BIDI WITH BRUSHES, 24″ BIDI WITH GUAGE

 

24

EXPLORATORY/MAINTENANCE PIPELINE PIGGING SERVICES

 

25

ACID PICKLING & PASSIVATION OF AGIP (KWALE) GAS PLANT

 

26

SPM CHANGE OUT BACK FLUSHING

 

27

CHEMICAL CLEANING OF IBOM POWER PLANT GAS LINE.

 

28

PIGGING OF 1 NO 18” X 14KM AND 2 NOS 4” X 14KM KWALE-IPP GAS LINE.

 

29

CONSTRUCTION/FABRICATION OF 4” X 32” GANGWAY

 

30

RURAL ELECTRIFICATION PROJECT II